Aerospace

The AAD service to the aerospace industry is conducted on an international level. The team is rich in experience in all aspects of environmental aerospace acoustics, from engine development cells and ground running facilities, through investigation and control of in-cabin noise, to the planned monitoring of commercial air traffic. The AAD team is a "one-stop" expert resource. Experience covers military and civil operations.

Aerospace Test Facility

Lyndon Yorke

In the field of engine ground running, our specialist engineers have been responsible for the strategic building design, detailed specification, assessment and refinement of noise control fit-out for the largest engine development bed in the world. This landmark facility is capable of accommodating engines developing thrust of 140,000 lbf and, in so doing, sets new low noise standards against which all future test bed facilities will be judged. AAD experience in test bed low frequency design strategy and assessment of noise suppression schemes, which also provide closely controlled airflow, is field proven. The team can provide sophisticated computer modelling to assess low frequency performance of aero-acoustic installations and to aid mitigation of noise impact upon local communities.

AAD has the instrumentation and the design experience needed to investigate ways to reduce excessive in-cabin noise and offers a comprehensive design service, guided by field research, to accommodate the acoustic behaviour of a whole range of modern, carbon-composite and honeycomb type aerospace materials.

AAD's understanding of noise arising from modern aircraft is such that the firm is responsible for the operation and maintenance of noise monitoring systems around the UK's busiest airports

aeroplane

AAD engineers understand aircraft noise and building acoustics. The AAD team is a natural choice whenever mitigation of aircraft noise is an essential feature. Whether the owner of a country house wants virtual silence from a local military airfield, or the assessment of a new airport terminal building is required, AAD consultants have a track record in delivering the right answers.